This post covers the fitting of the castors, and the final metal working. First up is the drilling of the mounting holes for the castors...
 |
Castors are fitted, ready for steel work. |
Did not take too many pictures of the drilling and filing of the steel plate. The end result is shown below however.
 |
Final castor pre-fit. |
 |
The finished steel plate, removed so the leg structure can be finished. |
The last T-Box post will cover the mounting of the small frame to the T-box proper, final assembly, and show the T-Box leg structure in service.
No comments:
Post a Comment