Wednesday, January 4, 2012

T-Box Legs: Final Milling on the Large Pieces

The two main operations left are: Cutting the rabbits for the shelves, and milling the mortises in the long run horizontals. There are still some minor things left, however the main task after this step is assembly.


Upper horizontals get a 1/2" rabbit.

Lower horizontals are milled with a 3/4" rabbit.

Lower long horizontals are ready for installation.

Upper long horizontals ready for installation.

While the long horizontals were getting worked on, the other pieces were drying...

Second set of legs is setting up nicely.

Assembly is started, the project should be done fairly rapidly at this point.

No comments:

Post a Comment