Now the castor pads will be attached, and the reinforcment block for the bottom shelf will be fabricated and installed.
|
Castor Pads - with glue drying. |
Once the glue is dry, a number of reinforcements will be installed. This is a high-stress part, so just gluing the pads on will not provide the needed strength.
|
Reinforcement Blocks - milled to size. |
|
Corners rounded over - ready for installation. |
|
Tools used to install the reinforcement blocks. |
|
First Batch drying. |
The rest of the block were glued in place later. The next post will cover the reinforcement of the castor pads, and the drilling of the same for the bolts. The project is almost complete - there are metal doublers to fabricate, and the whole project needs a coat of linseed oil.
No comments:
Post a Comment