Tuesday, December 20, 2011

A New Project - Improved T-Box Legs.

The next project is a better set of legs for the T-Box in the shop. As the following picture shows, the current arrangement has a number of limitations, include inefficient use of space, and difficulty in moment.

The new set of legs will have a set of locking castors, a mortise and tenon frame, with provisions made for leveling the T-box.

The current T-Box leg set.

First task is to get the legs milled and assembled...

First side jointed....

Jointed and milled to dimension on the first two sides....

Some of the wood that was removed in the re-sawing.

Re-sawing  involves the use of the table saw without a guard over the blade. As a direct result, the use of push sticks is strongly advised. When I was re-sawing the wood for the legs, the push-stick contacted the blade.... and shattered. I felt almost nothing - the blade is very good at cutting!

The re-saw setup.

Shattered push stick.

Wood is at final width and hight...

...and trimmed to final length.

The locations of the mortises are laid out.

Next step is to cut the mortises, and glue the legs together.

No comments:

Post a Comment